2026-08-28·par Sijie Wang#node#cybernetics#theory

necessity

Why large tasks need it

Parent: stages-and-gates

Stage-gating isn't bureaucracy for a big task — it's necessary, and five independent arguments converge:

  • Near-decomposability (Simon, 1962; the watchmaker parable) — Hora builds in stable sub-assemblies and finishes; Tempus builds monolithically and is destroyed by every interruption. A gate = where you stabilize a sub-assembly.
  • Error compounding — a long autonomous run has P(success) ≈ pⁿ, decaying with horizon; gates bound / reset it before it snowballs.
  • Real options under uncertainty (Dixit–Pindyck; Gompers 1995) — the bigger / more irreversible / more uncertain the task, the higher the option value of abandoning; staging buys that option.
  • Cost-of-defect curve (Boehm) — a defect costs ~exponentially more the later it's found; gates catch it early.
  • Cooper's NPD benchmarking — disciplined stage-gate processes show higher success rates empirically.

→ A "large task" = long-horizon + uncertain + irreversible + error-compounding + (often) an untrusted executor. Each clause independently demands stages + gates.

Formal derivations

The above are the claims; the rigorous backing — each written to stand as an independent paper (precise setup, explicit hypotheses, complete proofs, cited-vs-proved separated, honest scope) — lives in derivations:

sous-entrées
à propos de cette entrée

L'une des entrées de wiki de sijie. L'IA sur ce site est fondée sur le même corpus et répond à la voix de sijie, avec citations revenant à des entrées comme celle-ci — répondre coûte argent à sijie, donc cela attend derrière un code : entrer un code d'accès →