2026-11-18·por Sijie Wang#cybernetics#engineering#testing

actual-vs-expected

Actual versus expected — checking whether the eval predicted production

Every period an actuary divides the claims that happened by the claims the model said would happen, cell by cell. The ratio is called A/E. Where it sits near 1 the model holds. Where it does not, the model is wrong in that cell, and the cell says where to look.

A/Es=failures observed in segment sexposures×rate predicted for s\text{A/E}_s = \frac{\text{failures observed in segment } s}{\text{exposure}_s \times \text{rate predicted for } s}

For an AI system this table is the bridge that eval-is-not-yet-actuarial says is missing. The eval gives the predicted rate per segment. The live log gives the exposure and the failures. Nothing else is needed.

A worked case

The figures are made up to show how the table reads.

SegmentLive tasksRate from the evalExpectedActualA/E
Lookup10,0002%2001900.95
Drafting6,0005%3003301.10
Multi-tool action2,00012%2404301.79
All18,0007409501.28

The total says the eval is 28% optimistic. The rows say the eval is fine for two segments and badly wrong for the third. A team that looked only at the total would rescale everything by 1.28 and be wrong in all three.

Reading it

  • A/E above 1 in one segment: the test cases there are easier than real requests. Pull failing live cases into the golden-set.
  • A/E above 1 everywhere: the grader is lenient (judge-agreement), or failures in production are being found that the eval's pass criterion does not look for.
  • A/E below 1: either the test cases are harder than reality, or production is not finding its failures yet (loss-development). The second is more common and looks like good news.
  • A/E drifting over time in one segment: the traffic inside the segment is changing, or the model was updated.

What it needs

  • The same definition of failure on both sides. If the eval fails a reply for a missing fact and production only records customer complaints, the two columns measure different things.
  • The same segments on both sides (rating-variables).
  • An interval on each ratio. With 40 expected failures, an A/E of 1.2 is noise (detection-floor).
  • A known discovery lag. Compare a period only after its failures have had time to surface, or correct for the lag.

Up: actuarial-transfer · Next: loss-development · Kin: online-evals · regression-ci

Source: actual-to-expected analysis is standard practice in experience studies, from memory. The application and the example are worked here.

sobre esta entrada

Una de las entradas de wiki de sijie. La IA en este sitio está anclada en el mismo corpus y responde en la voz de sijie, con citas que vuelven a entradas como esta — responder le cuesta dinero a sijie, así que espera detrás de un código: ingrese código de acceso →

actual-vs-expected — Sijie Wang