2026-11-18·by Sijie Wang#cybernetics#engineering#testing

loss-development

Loss development — errors are found late

An accident happens in March and the claim arrives in October. At year end the insurer has seen only part of what the year will cost. The part not yet seen is called IBNR, incurred but not reported, and estimating it is the oldest routine in the profession.

AI errors have the same structure. The failure happens when the output is produced. It is discovered later, and how much later depends on what kind of error it is.

The failure rate a live dashboard shows today is "failures found so far". For recent traffic it is always below the final figure.

The triangle

Arrange failures by the month the interaction happened and by how many months have passed since. Each cell is the cumulative number found. The figures are made up to show the method.

Interaction monthAfter 1 monthAfter 2After 3After 4
January40606668
February446471
March3858
April42

The empty cells are the future. The chain-ladder method fills them from the columns that are complete.

Development factors, each the ratio of one column to the one before, over the rows that have both:

  • 1 to 2 months: (60+64+58)/(40+44+38)=1.492(60 + 64 + 58)/(40 + 44 + 38) = 1.492
  • 2 to 3 months: (66+71)/(60+64)=1.105(66 + 71)/(60 + 64) = 1.105
  • 3 to 4 months: 68/66=1.03068/66 = 1.030

Projected final counts, taking month 4 as fully developed:

Interaction monthFound so farFactor to finalProjected finalNot yet found
January681.00068.00.0
February711.03073.12.1
March581.13866.08.0
April421.69871.329.3
All239278.439.4

April looks like the best month on the dashboard, with 42 failures. Its projected final is 71, the second worst. The newest month always looks best, for no reason other than its age.

What it changes

  • Never compare a recent period with an old one on raw counts. Compare at equal age, or compare projected finals.
  • A new model version always looks better at first. It has had less time for its failures to surface. This is the same effect, and it flatters every release.
  • actual-vs-expected has to use developed figures, or a ratio below 1 is read as the eval being pessimistic when production has simply not found its errors yet.
  • Keep a separate triangle per failure type. A fast type and a slow type in one triangle give factors that fit neither.

Limits

  • It assumes the discovery pattern is stable. A new monitoring tool, a new channel for complaints or a change in the user base changes the factors.
  • The tail is the hard part. Four months of history cannot say what surfaces in month eighteen. Slow error types need a tail factor from somewhere else, and for AI there is nowhere else yet.
  • Some errors are never found. The triangle estimates what will be discovered. The gap between discovered and true is outside it.

Up: actuarial-transfer · Next: catastrophe-model · Kin: online-evals · actual-vs-expected

Source: the chain-ladder method is standard reserving practice; Mack (1993) gives its statistical basis. Both from memory. The triangle is invented; the factors and projections are computed here from it.

about this entry

One of sijie's wiki entries. The AI on this site is grounded in the same corpus and answers in sijie's voice, with citations back to entries like this one — answering costs sijie money, so it waits behind a code: enter an access code →